Laserfiche WebLink
l <br /> Knoll,SJCEHD 3iine 18,2007 �I <br /> Mr. Harlin Kn . <br /> Well Installation Work Plan <br /> A. Teichert and Sons Property, Stockton,CA <br /> Page 11 <br /> Task 4: Report Preparation <br /> After completing the field activities and receiving the laboratory results, Stratus will <br /> ing the findings of the additional assessment. The report will <br /> prepare a report document <br /> be submitted in the form of a Site Conceptual Model (SCM), as required by SJCEHD <br /> personnel. <br /> SCHEDULE <br /> Following approval of this Work Plan, an encroachment permit package will be forwarded <br /> to the City of Stockton. Following City of Stockton approval of the scope of work, well <br /> installation permits will be secured from SJCEHD and the work will be scheduled. <br /> Approximately three weeks will likely be necessary for a C-57 licensed contractor to <br /> become available. The report documenting work activities will be submitted within <br /> approximately six weeks of receiving all analytical results. <br /> I� If you have any questions or comments concerning this Work Plan, please contact Jay <br /> Johnson at (530) 676-6000. <br /> Sincerely, <br /> STRATUS ENYIKOWOENTAL, INC. <br /> Scott G. Bittinger, P.G. WJon,f Project Geologist <br /> 1 <br /> t Attachments: Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Figure 3 Geologic Cross Section A-A' <br />` Figure 4 Geologic Cross Section B-B' <br /> Figure 5 Geologic Cross Section C-C' <br /> Figure 6 Groundwater Analytical Summary Map <br /> Appendix A Field Practices and Procedures <br /> cc: Mr. George Takcmori, A. Teichert and Sons, Inc. <br /> Mr. James Barton, Regional Water Quality Control Board <br /> i <br /> K:CCeichcrtlStockton-1031W ork Planslteichert-well install work plan 06-2007.doc STRATUS <br /> r <br />