Mr. Harlin Knoll,SJCEHD June 18,2007 <br /> Well Installation Work Plan <br /> A.Teichert and Sons Property, Stockton,CA <br /> Page 6 <br /> Overexcavation was also performed following removal of Tank D by Elder in 1988. <br /> Information regarding the volume of soil excavated was not available in the documents <br /> reviewed for this report. <br /> Additional excavation was performed after Tanks T-5, T-6, and T-8, and the associated <br /> I <br /> dispenser island, were removed by Town and Country in 1999. Approximately 560 to 700 <br /> cubic yards of soil were subsequently transported to the Teichert facility in Tracy for bio- <br /> remediation prior to disposal. <br />� <br /> Soil Va or Extraction� p <br /> A subgrade SVE manifold was installed in the excavated area north of the lubrication <br /> station and warehouse. EMCON utilized this manifold and well MW-13 to perform an <br /> SVE test in October 1992. <br /> BCR installed well MW-14 in March 1994, and initiated SVE from well MW-14 at that <br /> time. Anderson reconstructed well MW-13 for vapor extraction, and simultaneous <br /> extraction from wells MW-13 and MW-14'began in January 1995. <br /> EMCON installed air sparge well AS-1 in.May 1995. Concurrent air sparging and SVE <br /> was initiated in June 1995. Use of the SVE/air sparge system was discontinued in <br /> December 1995. EMCON estimated that approximately 13,400 pounds of GRO have been <br /> removed via excavation and SVE. Stratus estimates that less than 50 pounds of GRO <br /> remain beneath the site. <br /> Bioventinl~ <br /> Bioventing activities were initiated on November 16, 2004, and are on-going. An oil-less <br /> compressor is utilized to pump air into wells MW-13, MW-14, and AS-1. In wells MW-13 <br /> and MW-14 the air is delivered via droptubes installed to approximately 1 foot above the <br /> pp Y <br /> bottom of the well. In well AS-1, the air is applied directly to the well casing, as in <br /> conventional sparging. Airflow from the compressor to the wells has ranged from 40 to 65 <br /> liters per hour, at pressures ranging from 24 to 30 pounds per square inch. <br /> Potential Sensitive Receptors <br /> The only potential off-site receptors appear to be water supply wells in the area. The <br /> depth of the groundwater beneath surface grade suggests it is unlikely that the dissolved <br /> hydrocarbons will impact surface waters. Analytical data collected to date suggests that <br /> the dissolved plume is not migrating vertically, and with the exception of 1,2-DCA, the <br /> dissolved plume appears restricted to the site. <br /> EMCON completed a water supply well survey in the second quarter of 1996. The nearest <br /> water supply wells appear to be situated in the vicinity of Fremont Street, approximately <br /> K:%TeichertlStockton-1031Work Plans4eichert-well install work plan 06-2007.doc SIMMS <br /> l <br />