Laserfiche WebLink
NO CHANGES TO THE SPECIFIED LEVELS OF PROTECTION SHALL BE WADE <br /> WITHOUT THE APPROVKL OF THE PROJECT TEAM LEADER. <br /> G. AN-SITE WORK PLANS ' <br /> Work Party(s) consisting of 2 or 3 persons will perform the <br /> following tasks: <br /> i <br /> Project Foreman tLV0Z _ t Supervisor �a.Yn�, �► <br /> Safety ` <br /> Recordkeeper <br /> Work Party #1 ��� Pipe fitter/labor, <br /> Rescue Team, Project Foreman Aid. in escape from ak = <br /> (required for entries to IDLH Work clothed - <br /> environments) 1/2 ;dace mask <br /> Decontamination Project Foreman <br /> >rf € Team <br /> The work party(s) were Briefed on the contents- of this plan at <br /> the start of the project. <br /> •H." COMMUNICATION PROCEDURES <br /> P/`Ersonnel in the Exclusion Zone and work area should remain in <br /> ronstant voice contact or within sight of other employees. <br /> Three Horn Blast is the emergency signal to indicate that all, <br /> personel should leave the work site. In addition, a loud hailer <br /> is available if required. <br /> The following standard hand signals will be used: <br /> Hand gripping.throat ------------- put .of air, can't breathe <br /> Grip partner's wrist or both hands . <br /> E <br /> arownd waist --�------------------ heave area immediately. I <br /> Hands on top of'head ------------ Need assistance <br /> G <br /> Thumbs u -- OK; I am all right, I understand <br /> Thumbs downT---------------------- No, negative <br /> PAGE 4 OF 8 <br />