Laserfiche WebLink
Monitor Well Testing <br /> - Total '-vdrocarbon, BTX and E tests were conducted in MW--3, <br /> 4 and 5, September 25, 1987, with the following results: <br /> le Results---September 25, 1987 <br /> Ground Water -Same <br /> TPS B T X EB <br /> Monitor Well No. PPM PPB PPB PPB PPB <br /> MW-3 Z.16 4.6 19.7 37.5 28 <br /> MW-4 '.16 C0.5 X0.5 C0.5 <0.5 <br /> MW-5 x.16 6.6 2.9 11.1 3.8 <br /> f Ground Water Sampling Results from <br /> Kleinfelder Report April 27, _1987 <br /> TPH B T X <br /> Monitor Well No. PPM PPB PPB PPB <br /> MW-1 16 4,700 9,200 7,200 <br /> ! MW-2 0.3 200 100 140 <br /> MW-3 0.3 19 3.4 6.5 <br /> Ground Water Sample Results---November 25 1987 <br /> f TPH B T X <br /> ` Monitor Well No. PPM PPB PPB PPB <br /> MW--3 28 C0.5, C0.5 X0.5 1 <br /> f, MW-4 ,• ���r <br /> -Mrd-5 :0.5 "' 0.5 '0.5 X0.5 <br /> : <br /> ;. i <br />