Laserfiche WebLink
... . ............. <br /> M <br /> Ira <br /> IN <br /> I_amu. ; <br /> westerly end (if this site and additional property to <br /> west is Used to make pickles. At least some of the brine water <br /> drains to the railroad to the north and floods onto Teichert's <br /> property. <br /> The borings :gilt be about 20 to 30 feet deep, depell(Aino on <br /> field observation. They will <br /> be backfilled with cement grout <br /> (45% sand, 50% cement and 5% bentonite) . Soil samples -dill be <br /> tested for salt and salt components related to the pickling <br /> industry. <br /> 7 <br /> If there are any questions, please do not hesitate to <br /> x contact me. Thank you. <br /> Sincerely, <br /> Elder, P.E. <br /> CORPORATION <br /> Attachments: <br /> 1. Kleinfelder Plates 2 & 53 <br /> 2. Plate No. 1: Vicinity map <br /> 3. Plate No. 2: Site Plan/Monitor Well Location <br /> 4. Plate No. 3: Water Well Man <br /> 5. Plate No. 4: Typical Monitor well Construction <br />