Laserfiche WebLink
1 <br /> A.7oichert&Son inc.Mobile Equipment Shop 103 N.'E'St.Stockton,CA. <br /> Remedial Action Plan March, 1994 <br />�• content from approximately 3% to a minimum of approximately 19%. <br /> We recommend a "tum-key's application that is assembled by the manufacturer or vendor. <br /> The unit should provide the following in addition to meeting the minimum operational <br /> requirements: <br /> R <br /> • A fully automated control system including: LEL sensor and controller, process flow <br /> sensor and measurement, air pressure sensor, high limit temperature controller, <br /> emergency shutdown button and 3-pen chart recorder <br /> • If a thermal oxidizer unit is utilized for effluent treatment, it should be designed with <br /> the ability to easily convert to catalytic operation. This flexibility is recommended <br /> because inlet VOC concentrations are expected due decrease over time, and <br /> catalytic operation may be economically justified at a later date. <br /> • If a thermal oxidizer is utilized, benzene destruction efficiency must be sufficient to <br /> prevent the release of greater than 0.15 lbs/day benzene. <br /> • An auto-dialer capable of 24-hour service that can distinguish and report various <br /> shut-down or emergency conditions <br /> • An entrained liquid separator knock-out pot with 40--gallon storage <br /> • A fully automatic vapor control system for dilution air, flame safety, burner, <br /> temperature controller and shut-downs, total hour meter-runtime and flame arrestor <br /> • Fluid drains (double block and bleed and automatic fuel control valves) meeting <br /> NFPA, IRI standards <br /> • Minimum 13' stack with cooling air inlet <br /> • non-hazardous wiring <br /> • influent and effluent sample ports, and well inlet flow rate gauge. <br /> s <br /> • O2 gauge <br /> A sound enclosure may be warranted depending on site-specific location criteria <br /> The connection of the module to electric power should be completed by certified electrician <br /> and be completed in accordance with municipal and applicable codes. Construction of the <br /> conveyance piping should be completed by licensed contractor. <br /> 8 <br />