Laserfiche WebLink
1 <br /> I <br /> 1 <br /> r Maintenance <br /> Shop & <br /> Office <br /> 1 � <br /> MW-4 <br /> (Dry) <br /> I <br /> r <br /> Hydraulic Gradient <br /> 0.0014 fidtt. <br /> MW-5 MW-10 <br /> (Dry) X52.04 <br /> d <br /> sJ sN <br /> �o M 11. <br /> PIP 52, a I <br /> MW-1 <br /> - 51.94 Active UST <br /> Gallery <br /> MW-9 <br /> (-51.87) Lube Pit & <br /> MW 2 <br /> MW-3 Wareholuse - 52- <br /> 1 (Dry) <br /> Approximate Scale <br /> 0 20 40 ft. <br /> 1 <br /> Groundwater Monitoring Well <br /> MW-13 <br /> 51.94 Groundwater Elevation, November 24, 1993 <br /> r ' <br /> Figure 3 Notes: BCR & Associates, Ltd. Project 93-108 <br /> Site Map from Drawing by <br /> Potentlometric Surface Map Emcon Associates, After Drawn By: <br /> November 24, 1993 Teichert. Well Head <br /> Trichrrt Cana{ruction Facility / <br /> Elevations From Emcon. Checked By: 1, /--7;1^7 -7 <br /> 103 North 'E' Strrrt, Stockton, CA Date: <br /> I <br />