Laserfiche WebLink
1 <br />' 1 INTRODUCTION <br /> EMCON Associates prepared this work plan on behalf of A. Teichert & <br />' Son, Inc. (Teichert) to remediate soil and complete the characterization of <br /> ground water impacted with petroleum hydrocarbons. In summary, the <br /> proposed work involves removal of soil surrounding a former pump island, <br />' excavation of potentially diesel-impacted soil from a former tank location <br /> near the east side of the site, collection of confirmation soil samples for <br />' chemical analysis, drilling an exploratory soil boring, and installing one <br /> ground-water monitoring well. The subject site is the Teichert mobile <br /> equipment facility located at 103 North E Street, Stockton, California (see <br />' Figure 1). The objectives of this work plan are to (1) characterize shallow <br /> ground water, (2) complete soil remediation at the site, and (3) assess <br /> whether petroleum hydrocarbon concentrations in the remaining soil adja- <br /> cent to the former tank excavations is sufficiently low enough for closure to <br /> be granted for the site. <br />' A copy of this work plan should be submitted to the San Joaquin County <br /> Environmental Health Department and Central Valley Regional Dilater <br /> Quality Control Board for comment prior to implementation. After receiving <br /> approval to proceed, EMCON Associates will promptly schedule the field <br /> activities. The subsequent report will be issued within 4 weeks following <br /> receipt of the certified analytical reports for sample analysis. <br /> pfl\M f920201 a 1 Rev. 0 June 1, 1992 <br />