My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006866
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
E
>
103
>
3500 - Local Oversight Program
>
PR0544638
>
ARCHIVED REPORTS XR0006866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 3:34:34 PM
Creation date
7/9/2019 1:52:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006866
RECORD_ID
PR0544638
PE
3528
FACILITY_ID
FA0004027
FACILITY_NAME
HENDRIX FORK LIFT INC
STREET_NUMBER
103
Direction
N
STREET_NAME
E
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15318001
CURRENT_STATUS
02
SITE_LOCATION
103 N E ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rja <br /> ACTUAL FIELD PROJECTS .� � r�l <br /> y; s <br /> Several innovative and successful bioremediation programs have been <br /> conducted by ProTek Environmental, Inc. of Huntington Beach, <br /> California using these Advanced Bioaugmentation Concepts. <br /> These projects are: <br /> A) The bioremediation of 2 , 000 cubic yards of diesel and oil <br /> contaminated soil for the Sacramento Municipal Utilities <br /> District (S.M.U.D. ) , which reduced the contamination levels <br /> from 2 , 800 ppm to less than 38 ppm in approximately 74 <br /> treatment days saving the customer $360 , 000 in disposal fees. <br /> B) The bioremediation of 1, 500 cubic yards of diesel contaminated <br /> soil at the former Kings Truck Stop in Sacramento, California. <br /> This project reduced the diesel and oil contamination levels <br /> from over 3 , 000 ppm to less than 30 ppm in approximately 62 <br /> treatment days. <br /> C) The current bioremediation of 25, 000 cubic yards of gasoline, <br /> diesel, and form oil contaminated soil at a major fabrication <br /> plant in South Gate, California is now being conducted and is <br /> achieving the similar results. <br /> To assure project control , reduced treatment times, and <br /> predictability of results, ProTek selected a consortia of <br /> commercially available bacteria cultures that have had a proven <br /> track record in dealing with petroleum hydrocarbon wastes. In this <br /> way, many of the problems and technical considerations previously <br /> addressed were dealt with„ and ProTek was able to carefully control <br /> the program. These selected formulations are based upon the use <br /> of organisms known as "Bacilli” and other naturally occurring soil <br /> bacteria which can compete favorably with the indigenous organisms <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.