Laserfiche WebLink
1 <br />' CONTENTS <br /> Tables and Illustrations E <br /> I Introduction <br />' 2 Background 2 <br /> 2.1 Removal of Tanks C-14 North, C-14 South, and WO-4 2 <br /> 2.2 Removal of Tank C-12 3 <br /> a 2.3 Removal of Tanks E and F 3 <br /> 2.4 Ground-water Characterization 4 <br /> r 3 Scope of Work 5; <br /> 3.1 Excavate Impacted Soil 5 <br /> 3.2 Characterize Soil in the Vicinity of Tank E g <br />' 3.2.1 Sample Analysis 7 <br /> 3.3 Characterize Ground Water 7 <br />' 3.3.1 Prefield Activities 7 <br /> 3.3.2 Monitoring Well Installation g <br />' 3.3.3 Well Development and Sampling g <br /> 3.3.4 Sample Analysis g <br /> 3.3.5 Elevation Survey g <br />' 3.4 Prepare Report g <br />' Appendix A Site Health and Safety Plan <br /> Appendix B Exploratory Boring and Well Installation Procedures <br /> Appendix C Sampling and Analysis Procedures <br /> p#\f921f920201 a i Rev. 0 June 1, 1992 <br /> curio 1 nssotiotea <br />