My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006874
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
E
>
103
>
3500 - Local Oversight Program
>
PR0544638
>
ARCHIVED REPORTS XR0006874
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 3:42:42 PM
Creation date
7/9/2019 1:58:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006874
RECORD_ID
PR0544638
PE
3528
FACILITY_ID
FA0004027
FACILITY_NAME
HENDRIX FORK LIFT INC
STREET_NUMBER
103
Direction
N
STREET_NAME
E
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15318001
CURRENT_STATUS
02
SITE_LOCATION
103 N E ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Well Purging <br /> Before sampling occurred, a polyvinyl chloride (PVC) bailer, centrifugal pump, low-flow <br /> submersible pump, or Teflon bailer was used to purge standing water in the casing and <br /> gravel pack from the monitoring well Monitoring wells were purged according to the <br /> protocol presented in Figure A-1 In most monitoring wells, the amount of water purged <br /> before sampling was greater than or equal to three casing volumes Some monitoring <br /> wells were expected to be evacuated to dryness after removing fewer than three casing <br /> volumes These low-yield monitoring wells were allowed to recharge for up to 24 hours <br /> Samples were obtained as soon as the monitoring wells recharged to a level sufficient for <br /> sample collection If insufficient water recharged after 24 hours, the monitoring well was <br /> recorded as dry for the sampling event <br /> Groundwater purged from the monitoring wells was transported in a 500-gallon water <br /> trailer, 55-gallon drum, or a 325-gallon truck-mounted tank, to EMCON's San Jose or <br /> Sacramento office location for temporary storage Pinnacle arranged for transport and <br /> disposal of the purged groundwater through Integrated Waste Stream Management, Inc <br /> Field measurements of pH, specific conductance and temperature were recorded in a <br /> waterproof field logbook Figure A-2 shows an example of the water sample field data <br /> sheet on which field data are recorded Field data sheets were reviewed for completeness <br /> by the sampling coordinator after the sampling event was completed <br /> The pH, specific conductance, and temperature meter were calibrated each day before <br /> field activities were begun The calibration was checked once each day to verify meter <br /> performance Field meter calibrations were recorded on the water sample field data sheet <br /> Well Sampling <br /> A Teflon bailer was the only equipment acceptable for well sampling When samples for <br /> volatile organic analysis were being collected, the flow of groundwater from the bailer <br /> was regulated to minimize turbulence and aeration Glass bottles of at least 40-milliliters <br /> volume and fitted with Teflon-lined septa were used in sampling for volatile organics <br /> These bottles were filled completely to prevent air from remaining in the bottle A <br /> positive meniscus formed when the bottle was completely full A convex Teflon septum <br /> was placed over the positive meniscus to eliminate air After the bottle was capped, it was <br /> inverted and tapped to verify that it contained no air bubbles The sample containers for <br /> other parameters were filled, filtered as required, and capped <br /> When required, dissolved concentrations of metals were determined using appropriate <br /> field filtration techniques The sample was filtered by emptying the contents of the Teflon <br /> bailer into a pressure transfer vessel A disposable 0 45-micron acrylic copolymer filter <br /> was threaded onto the transfer vessel at the discharge point, and the vessel was sealed <br /> CPIE ITEICHER MTRLY\,STOCK-GW DOC-95%g 1 A-3 Revision 1, 11/19/98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.