Laserfiche WebLink
• Mr George Takernori Project OF90-002 05 <br /> November 16, 1998 <br /> Page 5 <br /> Please call if you have any questions regarding this report <br /> Sincerely, <br /> Pinnacle <br /> Pa imisona J nson <br /> Project Geologist enior Project Supervisor <br /> 0R G 5867 <br /> /4/a t Turner <br /> Project Manager <br /> Attachments Table 1 Groundwater Monitoring Data <br /> Figure 1 Site Location Map <br /> Figure 2 Groundwater Elevation Contours (Third Quarter 1998) <br /> Figure 3 Groundwater Analytical Summary (Third Quarter 1998) <br /> Appendix A Sampling and Analysis Procedures <br /> Appendix B Chain-of-Custody Records and Laboratory <br /> Analysis Reports <br /> Appendix C Field Data Sheets <br /> CPIE 1TEICHERTIQTRLY\.STOCK-GW DOC-4SVsg 1 <br />