Laserfiche WebLink
Mr George Takemori Project OF90-002 05 <br /> August 15, 1996 <br /> Page 8 <br /> Please call if you have any questions regarding this report. <br /> Sincerely, <br /> 1 <br /> EMCON / <br /> Claudio Avila Jay Jo bison <br /> Project Geologist S for oject Supervisor <br /> R G 67 <br /> Matt Turner <br /> Project Manager <br /> Attachments Table i Summary of Well Data <br /> Table 2 Groundwater Monitoring Data <br />• Table 3 Extraction and Emission Rates <br /> Figure 1 Site Location Map <br /> Figure 2 Cenerahzed Site Plan <br /> Figure 3 Groundwater Contour Map (April 16, 1996) <br /> Figure 4 Groundwater Contour Map (May 17, 1996) <br /> Figure 5 TPHG Concentrations in Soil From 25 to 40 Feet BGS <br /> Appendix A Samphng and Analysis Procedures <br /> Appendix B Chain-of-Custody Records and Laboratory <br /> Analysis Reports <br /> Appendix C Analytical Results of Soil Samples Collected from Soil <br /> Borings and Beneath the Excavation <br /> SA(-%N WlUDF9WF9000205A5 95�p ] <br />