Laserfiche WebLink
EMCON- SACRAMENTO <br /> GROUNDWATER SAMPLING AND ANALYSIS REQUEST FORM <br /> • PROJECT NAME Teichert Construction <br /> 103 North E Street,Stockton <br /> SCHEDULED DATE August 30, 1995 <br /> SPECIAL INSTRUCTIONS/CONSIDERATIONS Project 1 ` <br /> 3rd Quarter Groundwater Monitoring Event Authorization til Turner <br /> Bring 2 drums from our warehouse Project \o OF90-002 004 <br /> VIW-9 is obstructed at 31 9' Sounder will pass Collect grab sample Task Code 001 <br /> u ith 3/4' diameter bailer Originals to I Asmus <br /> '4V--1 is obstructed at 43 3 the top of the casing is bent cc V1 Turner <br /> MW-13 &MW-l4 are being used as vapor extraction wells close valve <br /> on extraction piping(I at a time) prior to opening each well <br /> To be completed in conjunction with the monthly O&M <br /> Well Lock <br /> �I«-13 was reconstructed 12/94 Is currentiv a vapor well Number(s) <br /> Sample WW-13 it water is present 2357 <br /> Containert,e purge%ater tram NIW-13 & VIW-14 to one drum, dolphin <br /> separate from other wells <br /> Y CHECK BOX TO ALTHORIZE DATA ENTRY Site Contact Geor,e Takemon (916.) 386-6916 <br /> Name Phone # <br /> \keli Number Casing Casing Depth to <br /> or Source Diameter Length Water ANALYSES REQLESTED <br /> (inches) (teet) (feet) <br /> 5/30/95 <br /> %IW-9 20 688 63 19 All wells <br /> 1%iW-10 20 872 6395 TPH as Gasoline <br /> %IW-11 40 896 6427 BTEX <br /> MW-13 40 892 dry <br /> %IW-I4 40 78 5 6449 <br /> \IW-1 00 470 obstructed <br /> BIW-3 40 484 dry Water-levels only <br /> \IW-4 40 54 1 dry <br /> MW-5 40 53 2 dry [_J <br /> \IW-12 20 900 6482 <br /> Laboratory and Lab QC Instructions : <br /> CAS <br /> Page 1 <br />