Laserfiche WebLink
Ik <br /> . Mr. Harlan Knoll Project 201790-002.007 <br /> May 21, 1999 <br /> Page 2 <br /> Soil Disposal <br /> The stockpiled soil and pea gravel will be transported to Teichert's Tracy Plant, located at <br /> 29099 South MacArthur Road, Tracy, California, for bioremediation. A site map is <br /> attached. The estimated stockpile volume is 700 yds3. This estimate appears high ad the <br /> actual volume of material may be less than 700 yds3. Teichert will maintain records of the <br /> soil volumes transported to the site for treatment and will report the actual volume of <br /> material and provide final deposition of the soil in a brief letter report. <br /> If you have any questions, please call Matt Turner at (530) 676-6883 or George Takemori <br /> at(916) 386-6916. <br /> Sincerely, <br /> Pinnacle <br /> &4�;5 <br /> Mark Capps, R.G. Matt Turner <br /> Project Geologist Project Manager <br /> Attachments: Certified Analytical Results for Stockpiled Soil <br /> Site Map <br /> cc: George Takemori, Teichert <br /> i <br /> CPIE:ITEICHERTISTOCKTONIREPORTSISTKNP 102.DOC-9GUsg:1 �GstcuLG�G <br />