My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006976
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
E
>
103
>
3500 - Local Oversight Program
>
PR0544638
>
ARCHIVED REPORTS XR0006976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 3:36:54 PM
Creation date
7/9/2019 2:18:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006976
RECORD_ID
PR0544638
PE
3528
FACILITY_ID
FA0004027
FACILITY_NAME
HENDRIX FORK LIFT INC
STREET_NUMBER
103
Direction
N
STREET_NAME
E
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15318001
CURRENT_STATUS
02
SITE_LOCATION
103 N E ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I STi��TUS <br /> ENVIRONMENTAL INC 3330 Cameron Park Drive, Ste 550 <br /> Cameron Park California 95682 <br /> (530)676-6004-Fax (530)676-6005 <br /> IApril 25, 2006 <br /> Project No 2001-0103-01 <br /> I <br /> Mr Harlin Knoll <br /> San Joaquin County <br /> Environmental Health Department <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, California 95202 <br /> IRe Site Conceptual Model and Subsurface Investigation Report <br /> A Teichert and Sons Property <br /> I 103 North E Street <br /> Stockton, California <br /> (Site Code No 1555) <br /> I . Dear Mr Knoll <br /> I This report, and the interpretations and discussion of the data derived therein, have been <br /> prepared under the supervision of the undersigned Based on data from the most recent <br /> site investigation activities, additional borings are necessary to constrain the extent of the <br /> I 1,2 dichloroethane (1,2-DCA) impact Teichert would like to implement the <br /> recommendations in the attached report as soon as possible, your immediate review and <br /> response would be greatly appreciated <br /> ISincerely, <br /> OTRA7'U5 ENVIRONMENTAL, IN <br /> IS�p�1,1L GAO! <br /> Itephen J Carter <br /> Stephen J Carter, P G NO 5577 ay Jo on, P G <br /> IProject Geologist (P Project anager <br /> cc Mr George Takemori, and Sons, Inc <br /> Mr James Barton, Regional Water Quality Control Board <br /> I <br /> �i <br /> K ITeichertlStockton 1031Reportslscm 04-2006 doc Page 11 5TRA TU5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.