My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0006976
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
E
>
103
>
3500 - Local Oversight Program
>
PR0544638
>
ARCHIVED REPORTS XR0006976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 3:36:54 PM
Creation date
7/9/2019 2:18:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006976
RECORD_ID
PR0544638
PE
3528
FACILITY_ID
FA0004027
FACILITY_NAME
HENDRIX FORK LIFT INC
STREET_NUMBER
103
Direction
N
STREET_NAME
E
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15318001
CURRENT_STATUS
02
SITE_LOCATION
103 N E ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> STK3 Stockton Cleanup Journal <br />' 103 North E Street <br /> 10-29-92 Linda Turkatte said 1 could process purge and decon water through recycle system in <br /> Sacramento <br /> 12-03-92 EMCON sampled MW 10, 11, 12 and 13 <br /> 02-22-93 EMCON sampled MW 10, 11, 12 and 13 <br />' 05-10-93 EMCON sampled MW 10, 11, 12 and 13 <br /> 06-01-93 Linda Turkatte approved disposal of purge water from 12-3-92 and 2-22-93 sampling <br />' events through recycle system in Sacramento <br /> 07-213-93 EMCON sampled MW 10, 1 1, 12 and 13 <br />' 08-09-93 Linda Turkatte approved disposal of soil cuttings from MW-13 Linda also requested that <br /> I submit a letter on what I want to do next at Stockton <br />' 11-2A-93 Ramos/BCR sampled MW 10, 11, 12 and 13 <br /> 02-28-94 Ramos/BCR sampled MW 10, 11, 12 and 13 <br />' 03-10-94 Ramos/BCR started drilling MW-14 today <br /> 03-11-94 Ramos/BCR completed dnliing MW-14 today <br />' 03-16-94 Ramos/BCR performed a soil vapor a>traction test on MW-14 <br /> 07-05-94 RamoSIBCR sampled MW 10, 11, 12 and 14 <br />' 09-19-94 Rarnos/BCR sampled MW 9, 10, 11, 12, 13 a-id 1 a <br />' 12-13-94 Started vapor extraction systern today extracting from MW 1 a <br /> 12-19-94 Anderson sampled MW 10, 11, 12, 13 and 14 <br />' 12-22-94 Andersen collected air samples from MW-14 <br /> 12-29-94 Spectrum reconstructed MW 13 from 90' to 65' deep using 4" casing with 30' of screen for <br />' use as a vapor extraction well <br /> 01-04-95 Restarted vapor extraction system today extracting from MW 13 and 14 <br />' 01-20-95 Anderson collected air samples from MW 13 and 1d <br /> 02-23-95 Anderson collected air samples rrom MW 13 and 14 <br />' 03-03-95 Converted vapor extraction unit to catalytic mode <br />' 03-16-95 Anderson collected air samples from MW 13 and 14, and groundwater sampled MW 10, 11, <br /> 12, and 14 <br /> 04-14-95 EMCON collected air samples from MW 13 and 14 <br /> 1 <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.