Laserfiche WebLink
BOREHOLE LOG I CPT-4 <br />' STRATUS Project No 2001-0103-01 Site Teichert Propertj Drilling Company Fu ro Geosciences,Inc <br /> 103 North E Street,Stockton,CA Driller <br /> ate January 28,2006 Field Geologist Justin Crose <br />' <br /> Drilling Rig CPT Drilling Method Direct Push(CPT Truck) <br /> Borehole Diameter 2 inches Soil Sample Equipment NA <br /> Total Depth 106 feet bgs Water Sampling Equipment IIydropunch <br /> Well Completion Data <br /> Slotted Interval Casing Material <br /> Filter Pack Material Casina Diameter <br /> Seal Material Slot Size <br />' Backfill Material Neat Cement <br /> Sample ID Depth Sample % Time PID Soil Description <br /> (ft) Interval Rec (ppni) Class/ <br /> (ft) Water <br /> I63 60-63 Water Attempt failed <br />' CPT-4-77W 77 74-77 14 15 Water 5 Voas <br /> ICPT-4-97W 97 94-97 1520 Water 5 Voas <br /> CPT-4-106W 106 103-106 M 25 Water 5 Voas <br /> I <br /> I � <br /> 5TR71TU5 <br /> E MR01 I1ENTAL 14C <br /> i <br />