Laserfiche WebLink
Page 1 of 1 <br /> Mike Infurna [EH] <br /> .. <br /> From: J uez Vasquez vas roun <br /> g Ll q @g 'dzeroanalysis.com] <br /> i <br /> Sent: Monday, October 01, 2007 9 A AM <br /> To: Mike Infurna [EH] <br /> Subject: Pestana Drilling Activities <br /> Hi Mike, <br /> It's Joe with Ground Zero Analysis. I realized over the weekend that I forgot to give you a call at the <br /> end of the day on Friday to let you know how the field activities went at the Pestana Reeves site. We <br /> finished MW5 (TD=20 ft, 0.020" screen from 5-20 ft, 43 sand from 4-20 ft, hydrated bentonite pellets <br /> from 2.5-4 ft, grout to surface) on Friday and conpleted the five soil borings in the sidewalk. <br /> Everything went smoothly. Let me know <br /> if,you-have any additional questions. <br /> Thanks, <br /> Joe Vasquez, <br /> Staff Geologist <br /> Ground Zero Analysis <br /> fl <br /> j . <br /> i <br /> 10/1/2007 <br />