Laserfiche WebLink
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> Physical Hazards <br /> Task(s) Hazard Mitigation Measure <br /> Heavy Equipment (Noise &Physical All heavy equipment used on this project will be <br /> contact) in good working order and operated in <br /> accordance with recognized industry standards <br /> and Cal-OSHA Title S, Subchapter 4, <br /> Construction Safety Orders in addition, an <br /> exclusion zone applies to all personnel The <br /> exclusion zone will be 20 feet to the front and <br /> ether side of the operating drill rig Personnel <br /> will not be allowed under booms or augers at any <br /> time <br /> All equipment operators and ground crews <br /> working in close proximity of heavy equipment <br /> will be supplied with ear protection <br /> 1,2 Dust The dust hazard will be mitigated by not allowing <br /> ground crew to be located down wind of drilling <br /> and excavation activity In addition, water will <br /> be applied to control the dust if visible levels of <br /> dust are generated <br /> Fire and Explosion Hazards <br /> List Flammable or Combustible materials on-site Keep sources of ignition away from these <br /> materials <br /> Flammable (Flash Point <100 IF) Combustible (Flash Point <200 °F) <br /> Gasoline Diesel <br /> Type and Location of Fire Extinguishers (Show on map for large projects/ <br /> Dry chemical fire extinguishers, Class A B and C are stored in all GZA vehicles <br /> PAGE 4 <br />