Laserfiche WebLink
• Page 12 <br /> The direction of groundwater flow was determined by drawing <br /> a line perpendicular to the groundwater contours establish- <br /> ed as described. Flow direction is expressed as the angle <br /> in degrees between North and the direction of groundwater <br /> flow On December 2 , 1994 , groundwater as found to be <br /> flowing N-310 -E. <br /> ENVIRONMENTAL COMPLIANCE ACTIVITIES SCHEDULED FOR THE NEXT <br /> DARTER <br /> Approval will be sought from PHS/EHD to perform quarterly <br /> compliance monitoring at the site during the month of <br /> February , 1995 . A summary report document will be then be <br /> prepared and submitted prior to March 15 , 1995 <br /> EPM expects to complete remediation of the 40 cubic yards <br /> of TOG contaminated soil excavated at 275 Grant Line Road <br /> after submitting additional information requested by Mr. <br /> Infurna in his letter of January 3 , 1995 <br /> A workplan for the exploratory trenching referenced on Page <br /> 12 of EPM` s July 11 , 1994 Quarterly Summary Report will be <br /> • submitted to PHS/EHD in an effort to complete the plume <br /> definition at the subject site . <br /> John E Rap , REHS <br /> Manager of Field Services <br /> 0FF.SS)pM <br /> 40 <br /> Marvin KYrkeby , P.E. LU <br /> o.14D0i m <br /> Registered Civil Engineer Up 3 !1 <br /> MK/JER:ms 11)1CIVO- <br /> enc . Figures L04 <br /> it A\,\k� <br /> Appendix A <br />