Laserfiche WebLink
ENVIRONMENTAL COMPLIANCE ACTIVITIES SCHEDULED FOR THE NEXT <br /> QUARTER <br /> EPM will carry out the assessment tasks described in an <br /> approved workplan Work will be scheduled to begin within <br /> two weeks of EPM ' s receipt of PHS/EHD and City of Tracy <br /> approval The field portion the treatability study <br /> previously approved for on-site remediation of hydrocarbon <br /> contamination of soil and water has begun The next <br /> sampling of the on-site wells for compliance monitoring <br /> will be performed during latter part of the month of <br /> February , 1994 <br /> \.)C& <br /> Sohn E Rap , REHS QPOVESS10H <br /> EPM Technologies , Inc 4q p, K� 'a[P <br /> No.14001 x <br /> rt <br /> c �p33/ C s <br /> Marvin Kirkeby, P E <br /> Registered Civil Engineer ��q CjY��. <br /> TF OF Cp1.�FO <br /> MK/ JER ms <br /> enc Appendix A Reports of Laboratory Analyses , Chain <br /> of Custody Documents , Well Monitoring <br /> Forms <br /> Appendix B Calculations of the Direction of Ground- <br /> water Flow and Hydraulic Gradient <br /> Page 5 <br />