TABLE 1 - CHECKLIST OF REQUIRED DATA
<br /> • FOR NO FURTHER ACTION REQUESTS AT UNDERGROUND TANK SITES
<br /> Site Name and Location Former Reeves Exxon, 2360 East Street, Tracy, Califorma
<br /> 1 Distance to production wells within 2,000 feet of the site No municipal, domestic, agricultural or
<br /> industrial wells are listed Figure attached from RESNA Industries Second Quarter 1992 Monitoring and
<br /> Sampling Report July 21, 1992
<br /> 2 Site maps Figures attached from Ground Zero Analysis, Inc reports Phase U Additional Subsurface
<br /> Investigation January 14, 1998 and Annual Groundwater Monitoring and Sampling Report November 1,
<br /> 1999
<br /> 3 Cross sections See attached figures from EPM Technologies' Quarterly Summary Report, May 14, 1994
<br /> and July 11, 1994
<br /> 4 Stockpiled soil Stockpiled soil has been removed See RESNA Industries Third Quarter 1992
<br /> Monitonng and Sampling Report October 12, 1992 Ninety cubic yards of soil (114 47 tons) were
<br /> transported by Cardoza Trucking to Forward Landfill in Manteca.August 21, 1992
<br /> 5 Monitoring wells remaining onsite Wells MW 1, MW2 and MW3 will be destroyed upon issuance of no
<br /> further action required(NFAR)letter
<br /> 6 Tabulated results of groundwater elevations See table attached
<br /> 7 Tabulated results of all sampling and analyses, including detection limits for confirmation sampling and
<br /> lead analyses See tables attached from Waterwork Soil Sampling Report June 7, 1991, EPM
<br /> Technologies reports Quarterly Summary Reports,May 14, 1994 and October 7, 1994, and Ground Zero
<br /> Analysis, Inc reports Phase H Additional Subsurface Investigation January 14, 1998 and Annual
<br /> Groundwater Mom tonng and Sampling Report November 1, 1999
<br /> 8 Concentrations contours of contani mants remammg in sod and groundwater See figures attached
<br /> 9 Zone of influence for remediation system Not applicable
<br /> 10 Reports/unformataon
<br /> Unauthorized Release Form not available in file, reported to PHS/EHD by RESNA in January 1991
<br /> Quarterly Monitoring Reports-RESNA Industries Quarterly Monitoring and Sampling Reports, June
<br /> 21, 1992, October 12, 1992, and January 5, 1993, EPM Technologies Quarterly Summary Reports
<br /> September 17, 1993,May 14, 1994, July 1, 1994, August 11, 1994, October 7, 1994, January 11, 1995,
<br /> April 11, 1995, Ground Zero Analysis, Inc. Annual Groundwater Monitoring and Sampling Reports,
<br /> July 14, 1995, July 18, 1996, November 1, 1996, August 13, 1997, November 3, 1998, and November 1,
<br /> 1999
<br /> Other reports-Waterwork Soil Sampling Report June 7, 1991, RESNA Industries Summary Report
<br /> Assessment of Soil and Groundwater Contamination, February 2, 1992, Ground Zero Analysis, Inc
<br /> report Phase HAdditional Subsurface Investigation January 14, 1998
<br />
|