Laserfiche WebLink
longer recognizable. If the symptoms appear critical, persist or <br /> become worse, immediate medical attention will be sought. <br /> When working around mechanical equipment the potential exists for <br /> exposure to excessive noise. To deal with the health hazards of <br /> excessive noise, ear plugs will be provided. <br /> 6. PERSONAL PROTECTION EQUIPMENT REQUIREMENTS <br /> This section specifies personal protective equipment required for <br /> the various tasks of this project. <br /> Respiratory Protection: All field personnel will be required to <br /> have available an air purifying respirator with organic vapor <br /> cartridges. The respirators will be required based on criteria <br /> presented in this safety plan. All respirators must be NIOSH <br /> approved, canister-equipped for all organic vapors up to 100 ppm. <br /> Protective Clothing: All field personnel who handle contaminated <br /> soil or liquid will wear impervious coveralls and butyl rubber <br /> gloves. Impervious coveralls will not be required if soil or water <br /> is not visibly contaminated, or if vapor measurements are below 500 <br /> ppmv. Level "D" protective clothing and equipment will be worn at <br /> all times on the job site. All employees will have level "C" <br /> protective equipment available at all times. The Site Safety <br /> Officer or his representative will monitor air borne contaminate <br /> levels for determination of when to don level "C" equipment. <br /> Head Protection: Field personnel will wear non-metallic safety <br /> helmets. <br /> Foot Protection: Field personnel will wear boots with steel toes. <br /> Under non-liquid exposure conditions, leather boots with steel toes <br /> and shanks are permissible. <br /> Ear Protection: Field personnel, based on noise levels, may be <br /> required to wear earplugs during drilling or soil excavation. <br /> Eye Protection: Field personnel will wear chemical-resistant <br /> safety glasses with attached side shield where splashes of <br /> potentially hazardous liquid or particles are likely. <br /> 7. WORK ZONES <br /> The work zone for the drilling of the borings for this site will be <br /> identified and personnel not envolved with the drilling and <br /> sampling will be kept away. <br /> The following is not required for this project. Omit_ excluded <br /> section of 7 8 9 and 9 . 1 . <br /> During soil excavation operations, a work zone around the <br /> 6 <br />