My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EDISON
>
405
>
2900 - Site Mitigation Program
>
PR0544640
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2019 5:26:06 PM
Creation date
7/9/2019 3:42:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544640
PE
3528
FACILITY_ID
FA0010849
FACILITY_NAME
FOWLERS BODY SHOP
STREET_NUMBER
405
Direction
N
STREET_NAME
EDISON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
135-460-06
CURRENT_STATUS
02
SITE_LOCATION
405 N EDISON ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• K L E I N F E L D E R <br /> drums and left on site for later discharge or disposal by the client, depending on <br /> laboratory results. The drums are labeled with the date, well number, and a contact <br /> person and phone number. <br /> A-3.3 Equipment Decontamination <br /> To reduce the potential for cross-contamination between wells, developing equipment is <br /> washed in a trisodium phosphate or non-phosphate detergent solution and rinsed in <br /> distilled water or steam cleaned prior to use in the next monitoring well. <br /> A-3.4 Well Survey <br /> tThe locations of soil borings and monitoring wells, and the elevation of the top of the <br /> PVC casings are usually surveyed and tied into permanent markers, if readily available. <br /> Survey accuracy is 0.1 foot for the "x" and "y" coordinates and .01 foot for the 'Y' <br /> coordinates. The depth to static groundwater is measured from a set location at the top <br /> of the PVC casing (usually the north rim). The depth of water is then subtracted from <br /> the elevation of the top of the well casing to provide a groundwater elevation for each <br /> monitoring well location. <br /> A-4 GROUNDWATER MONITORING <br /> r A-4.1 Water Level Measurements <br /> ■ Water level measurements are made in the wells prior to purging and sampling the <br /> wells. Measurement protocol is as follows: <br /> 1. Prior to obtaining water level measurements, the monitoring wells would be <br /> opened and allowed to equilibrate for a period of approximately '/ hour. <br /> 2. The water level probe is decontaminated in a trisodium phosphate or non- <br /> phosphate detergent wash, followed by a distilled water rinse, prior to use in <br /> each well. <br /> 3. Water level measurements are made using a conductivity-based water-level <br /> meter. Depth-to-water is generally measured from a surveyed mark on the north <br /> rim of the PVC well casing. <br /> The water level measurements are converted to elevations using the surveyed casing <br /> elevations. <br /> 1 A-4.2 Groundwater Sampling <br /> Groundwater samples are collected from the monitoring wells at the site. The sampling <br /> protocol for each well is as follows: <br /> 79658.GW11ST07R7901FB:Iv Page A-5 <br /> OO 2007 Kkeinfelder October 2, 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.