Laserfiche WebLink
. KLEINFELDER <br /> 1. INTRODUCTION <br /> 1 Kleinfelder has prepared this workplan on behalf of A. G. Spanos Companies, for a <br /> limited hydrogeologic evaluation of the proposed Gateway Development in San Joaquin <br /> County. <br /> The workplan includes the installation of seven piezometers throughout the proposed <br /> development area. Pressure transducers will be subsequently be installed in each <br /> piezometer to record water levels over time. Prior to the installation of the transducers, <br /> a groundwater sample will be collected from each piezometer for the evaluation of <br /> general groundwater quality at the site. <br /> This workplan has been prepared in accordance with Kleinfelder's proposal titled <br /> "Revised Proposal, Limited Hydrogeological Services and Groundwater Level <br /> Monitoring Program, Gateway Property Development, San Joaquin County, California" <br /> (File No. ST06P298, dated August 24, 2406). This workplan is subject to the limitations <br /> presented in Chapter 5. Any other party (other than A. G. Spanos Companies or <br /> regulatory agencies having enforcement jurisdiction for the site) who would like to use <br /> this document shall notify Kleinfelder, Inc. and request permission of such intended use <br /> in writing. <br /> r <br /> 79658.GW1/5T07R790/FB:Iv Page 1 of 9 <br /> 0 2007 Kleinfelder October 2,2007 <br />