Laserfiche WebLink
King Island Resort page 2 <br /> 11530 W. Eight Mile Rd <br /> work plan comment/approval <br /> COMMENTS AND CONDITIONS : <br /> • TPH as diesel is to be analyzed for in selective soil samples and in <br /> first ground water sample for each new well . <br /> • Updated Site Conceptual Model to be at the EHD within 60 -days of <br /> the end of this phase of field work and the revised CAP within 45- <br /> days after that date. <br /> • An adequate number of soil samples are to be collected and <br /> analyzed for all petroleum constituents of concern (TPHg & d , BTEX, <br /> Oxygenates , lead scavengers , etc) so that conclusions for <br /> delineation can be supported . A soil sample is to be collected at the <br /> total depth of each boring and analyzed for all constituents of <br /> concern . <br /> • The EHD will require only one Well Permit Application Form and $374 <br /> fee for all parcels owned by Westrec Marinas . Drilling on parcels <br /> NOT owned by Westrec Marinas shall include a signed access <br /> agreement from the landowner with the Well Permit Application Form <br /> and $374 fee . <br /> • Continue to upload all worklans , addendums, reports , laboratory <br /> p P <br /> data , DTW, and maps to Geotracker in a timely manner. <br /> REASONS FOR DISAPPROVAL OF THE WORKPLAN fH &S Section <br /> 25296 . 10 (c)(3 )1 : <br /> none. <br /> DATED : July 9 , 2007 BY ',`G � ✓�6 � <br /> Michael Infurna , REH (209) 468-3454 <br /> MI / <br /> cc: CVRWQCB — James L . L . Barton , Sacramento . <br /> SW RCB — CUF — Mark Owens , Sacramento , <br /> ATC Inc . — Todd Hafner, 1117 Lone Palm Ave , #B , Modesto , 95351 <br /> [X] electronically transmitted to consultant on : July 9 , 2007 <br />