My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
11530
>
2900 - Site Mitigation Program
>
PR0541077
>
SITE INFORMATION AND CORRESPONDENCE FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 11:46:55 AM
Creation date
7/10/2019 9:40:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0541077
PE
2960
FACILITY_ID
FA0023517
FACILITY_NAME
PS MARINA 5 / KING ISLAND RESORT
STREET_NUMBER
11530
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
07119006
CURRENT_STATUS
01
SITE_LOCATION
11530 W EIGHT MILE RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATC Associates Inc. <br /> 1117 Lone Palm Avenue, Suite B <br /> Modesto, California 95351 <br /> 209-579-2221 <br /> fax: 209-579-2225 <br /> pSS OCIATES INC . <br /> Monitoring Well <br /> The monitoring well will be constructed of 2.0-inch ID and 2.375 OD schedule 40 PVC well <br /> materials . Drilling will be completed with a 6.750-inch to 7. 875-inch diameter mud rotary bit to <br /> approximately 110 feet bgs. Well construction will consist of ten feet of 0.020-inch slotted <br /> screen and 100 feet of PVC riser. Sand pack will be placed within the well annulus from the <br /> terminal depth to approximately three feet above the screen with approximately three feet of <br /> hydrated bentonite chips above the sand pack. The remaining annulus will be grouted in-place <br /> with a 4-5% bentonite/cement grout slurry to the surface. <br /> Drill Cuttings <br /> Provide a roll-off container or suitable container to store the soil cuttings, etc . Waste <br /> characterization and disposal will be completed by others . <br /> Please itemize your . costs and provide an estimated duration in days to complete the well. <br /> Specify the duration between setting inner/outer conductor casing and mud as well as completing <br /> the monitoring well. <br /> i <br /> i <br /> i <br /> i <br /> f <br /> t <br /> f <br /> i <br /> r <br /> i <br /> I <br /> it <br /> 2 ATC Associates Inc, <br /> S :\Environmental\62514.000I\Addendum to: Drilling Bid Request.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.