Laserfiche WebLink
05/25/ 2007 13 : 28 9253130304 GREGG DRILLING - = PAGE 03 <br /> t <br /> Page 2 <br /> Mr. Evans L <br /> May 25, 2007 <br /> r <br /> Task 2: Install &inch Conductor Pipe <br /> i <br /> Mobilization/Demobilization/Daily Travel <br /> 1 day @ $450.00/day $450.00 t <br /> Drilling Services (includes rig and support equipment, <br /> not materials) to Include: <br /> Drill, sample and install using mud rotary <br /> one, eight-inch conductor pipe to a depth <br /> of 98 feet. Soil sampling every rive feet, <br /> 1 day @ $29700.00/day $2,700.00 <br /> Materials for eight-inch conductor pipe <br /> 98 feet @ $40,00/foot $3,920.00 i <br /> Rental fee for Forklift and Hopper <br /> 1 day (Qc $350.00/day 350 .00 <br /> TOTAL Task 2: $7,42040 <br /> Task 3: Install Two-inch Monitorinsr VYeII <br /> s Mobilization/Demobilization/Daily Travel <br /> 1 day @ $450.00/day $450.00 } <br /> Drilling Services (includes rig and support equipment, <br /> not materials) to include: <br /> Drill, sample and install through the above <br /> conductor pipe one, two-inch monitoring <br /> well to a depth of 110 feet. Soil sampling k <br /> every five feet. <br /> '4 day @ $2,340.00P'r4 day $2,34040 <br /> Flush well completions <br /> 1 completion @ $175.00/completion $175.00 I <br /> Materials to install two-inch monitoring well <br /> 110 feet @ $12.00Pfoot $ 11320. 00 <br /> 4 <br /> i <br /> Rental fee for Forklift and Hopper <br /> 1 day @ $350.00/day $350,00 <br /> TOTAL Task 3: $4,635.00 <br /> i <br /> i <br /> I <br /> i <br /> I <br />