My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
11530
>
2900 - Site Mitigation Program
>
PR0541077
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 11:19:21 AM
Creation date
7/10/2019 9:50:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0541077
PE
2960
FACILITY_ID
FA0023517
FACILITY_NAME
PS MARINA 5 / KING ISLAND RESORT
STREET_NUMBER
11530
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
07119006
CURRENT_STATUS
01
SITE_LOCATION
11530 W EIGHT MILE RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KING ISLAND RESORT Page 1 of 1 <br /> Path 10 Closure Plan _ © GEOTRACNER HOME MANAGE PROJECTS REPORTS I SEARCLOGOUT <br /> KING ISLAND RESORT (70607700310) - MAP THIS SITE OPEN- REMEDIATION <br /> 11530 EIGHT MILE RD WCLEANUP OVERSIGHT AGENCIES <br /> STOCKTON , CA 95289 ACTIVITIES REPORT SANJOAQUIN COUNTY LOP (LEAD) - CASE#: 15W <br /> CASEWORKER: ANGELICA SANDOVAL MA RIN - SUPERVISOR: ADRIENNEELLSAESSER <br /> SAN JOAQUIN COUNTY PUBLIC VVEBPAGE CENTRAL VALLEY RWQCB (REGION 5S) - CASE* 39W02 <br /> vEW PRIWABLE CASE SUMMARY FOR THIS SITE CASEWORKER: JAMES GARTON - SUPERWSOR CORI CONDON <br /> CUP Claim k 3658 ' CUT Priority Assigned: C CUP Amount Paid: $671,261 <br /> THIS PROJECT WAS LAST MODIFIED BY NUEL HENDERSON ON 12/5201311:54:0] AM - HISTORY <br /> THIS SITE HAS SUBMITTALS. CLICK HERE TO OPEN A NEW WINDOW WITH THE SUBMITTAL APPROVAL PAGE FOR THIS SITE. <br /> Path to Closure Plan - FY 12/13 THIS VERSION IS FINAL AS OF 1VSMO13 PATH TO CLOSURE HISTORY CLEAR IRESET PATH TO CLOSURE PLAN <br /> IMPEDIMENT 1 : <br /> General Criteria F: Secondary source has NOT been removed to the extent practicable ❑ Procedural Impediment - INFO <br /> Step to Resolve Impedlment 1 - Step 1: -DELETE STEP <br /> COMPLETION DATE <br /> Restart the ozone sparge pilot testing utilizing all three sponge wells that was partially tested. vn <br /> PROJECTED DATE ACTUAL DATE <br /> rest ne. s s az e <br /> 2011. <br /> 3/31/2014 I I <br /> Step to Resolve Impediment t - Step 2: - DELETE STEP COMPLETION DAIS <br /> to <br /> ozone pilot test and submit report of findings and corrective action plan. <br /> PROJECTED DAM <br /> ACTUAL OATS <br /> 12I31I2014 <br /> Step to Resolve Impediment I . Step 3: - DELETE STEP <br /> COMPLETION DATE <br /> After conducting p submit f c participation For CAP, anal remediation plan. ACNAL GATE <br /> Ro3131/2m5A� f <br /> Step to Resolve Impediment 1 - Step 4: - DELETE STEP <br /> COMPLETION DATE <br /> Implement and complete final remediation plan. <br /> PROJECTED DATE <br /> 31312016 F <br /> AODADDITIONAL STEP <br /> IMPEDIMENT 2: <br /> Med-a-So f Citria• Groundwater: The contaminant plume that exceeds water quality objectives is fl Procedural Impediment - 7NHFo <br /> NOT stable or decreasing in areal extent, and does NOT meet all of the additional characteristics of one of <br /> the five classes of sites. <br /> Conditions that do not meet the policy criteria: <br /> e Plume Length (That Exceeds Water Quality Objectives): ?: 100 Feet and < 250 Feet <br /> e Nearest Supply Well (From Plume Boundary): < 250 Feet <br /> e Nearest Surface Water Body (From Plume Boundary): 5250 Feet <br /> Stepto Resolve Impediment 2 -Step 1: -DELETE STEP <br /> COMPLETION GATE <br /> To reduce p eengltt or ensh <br /> re the nearbys will no c Ling <br /> contaminants, complete pilot test and submit report of findings and corrective acts plan PROJECTED DATE TE <br /> 12/31/2014 F <br /> Step to Resolve Impediment 2 - Step 2: -DELETE STEP <br /> COMPLETION GATE <br /> er conducting public participation for CAP, submit final remediation plan. <br /> PROJECTED OAIE ACNAL DATE <br /> 3/31/2015 <br /> Step to Resolve Impediment 2 - Step 3: -DELETE STEP <br /> COMPLETION DATE <br /> implement and complete final remediation plan. ACTUAL DATE <br /> Ro31312016A� <br /> ADD ADDITIONAL STEP <br /> REQUIREMENTS ALONG PATH TO CLOSURE <br /> PUBLIC WELL <br /> DATE IDENTIFIED RP NOTIFICATION PARTICIPATION DESTRUCTION WASTEDISPOSAL LAND USE SITE CLOSURE <br /> FOR CLOSURECLOSURE INITIATED BY DATE COMPLETION DATE DATE DAM RESTRICTION GATE DATE <br /> F— SANJOAQUIN COUNTY LOP F� F F i F� I —_ J <br /> • Dale Identified for Closure Is the date all Impediments to closure have been removed <br /> Save in Progress Save as Final <br /> LOGGED IN AS HENDERSONN CONTACT GEOTRACKER HELP <br /> https://geotracker.waterboards.ca.gov/regulators/screens/closure_lolicy.asp?global_id=TO. . . 12/5/2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.