My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23500
>
2800 - Aboveground Petroleum Storage Program
>
PR0528391
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 2:56:55 PM
Creation date
7/10/2019 9:50:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0528391
PE
2832
FACILITY_ID
FA0007158
FACILITY_NAME
CDCR-DEUEL VOCATIONAL INSTITUTION
STREET_NUMBER
23500
STREET_NAME
KASSON
STREET_TYPE
Rd
City
Tracy
Zip
95304
APN
23912001
CURRENT_STATUS
01
SITE_LOCATION
23500 Kasson Rd
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STI SP001 Annual Inspection Checklist <br /> General Inspection Infor atign : <br /> Inspection Date: ! Z 1 Oil <br /> 7 Retain Until Date: <br /> Z .- _ (3fi months from inspection date) <br /> Prior Inspection Date: ,/6! <br /> Inspector Name: d�'7� <br /> Tanks Inspected (ID #'s): )/ a <br /> Inspection Guidance : <br /> i For equipment not included in this standard, follow the manufacturer recommended inspection/testing schedules and procedures. <br /> The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure. This visual inspection does not require a certified <br /> inspector. It shall be performed by an owner's inspector who is famillar with the site and can identify changes and developing problems. <br /> Inspect the AST shell and associated piping , valves, and pumps including inspection of the coating for Paint Failure. <br /> y Inspect: <br /> 1 . Earthen containment structures including examination for holes, washout, and cracking in addition to liner degradation and tank settling . <br /> 2. Concrete containment structures and tank foundations/supports including examination for holes , washoutsettlih <br /> corrosion and leakage. , g , paint failure, in addition to examination for <br /> 3. Steel containment structures and tank foundations/suppbrts including examination for washout, settling , cracking , and for paint failure, in addition to <br /> examination for corrosion and leakage. <br /> Inspection of cathodic protection system , if applicable, includes the wire connections for galvanic systems and visual inspection of the operational components <br /> (power switch , meters, and alarms) of impressed current systems. <br /> y Remove promptly upon discovery standing water or liquid in the primary tank, secondary containment area, interstice, or spill container. Before discharge to the <br /> environment, inspect the liquid for regulated products or other contaminants and disposed of it properly. <br /> In order to comply with EPA SPCC (Spill Prevention, Control and Countermeasure) rules , a <br /> operation (40 CFR 112. 8 (c)(8) (v)). facility must regularly test liquid level sensing devices, to ensure proper <br /> O designates an item in a non-conformance status. This indicates that action is required to address a problem . <br /> Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design , a certified inspector, or a tank <br /> manufacturer who will determine the corrective action. Note the non-conformance and corresponding corrective action in the comment section . <br /> y Retain the completed checklists for 36 months. <br /> r Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists . <br /> Note: If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current <br /> pian requirement by a Professional Engineer knowledgeable in SPCC development and implementation . <br /> AST INSPECTION STANDARD 31 <br /> JULY 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.