Laserfiche WebLink
W� 711, 1 <br /> k 0 kg�� <br /> STI SP001 Annual Inspection Checklist <br /> General Inspection Information : <br /> inspection Date: e Retain until Date: i (38 months from inspection date) <br /> • �� [ � Inspector Name: <br /> Tanks Inspected (ID Vs) /7 <br /> : la Z � ©� 6 7 �� 0ec 2 VPO <br /> inspection Guidance : �C <br /> i For equipment not included in this standard , follow the manufacturer recommended inspection/testing schedules and procedures . <br /> The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure. This visual inspection does not require a ceilifted <br /> inspector. It shall be performed by an owner's inspector who is familiar with the site and can identify changes and developing problems . <br /> Inspect the AST shell and associated piping , valves, and pumps including inspection of the coating for Paint Failure. <br /> "r Inspect: <br /> 1 . Earthen containment structures including examination for holes, washout, and cracking in addition to liner degradation and tank settling . <br /> 2 . Concrete containment structures and tank foundations/supports including examination for holes, washout, settling , paint failure , in addition to examination for <br /> corrosion and leakage. <br /> 3. Steel containment structures and tank foundations/supports including examination for washout, settling , clacking , and for paint failure, in addition to <br /> examination for corrosion and leakage . <br /> r Inspection of cathodic protection system , if applicable, includes the wire connections for galvanic systems and visual inspection of the operational components <br /> (power switch , meters , and alarms) of impressed current systems . <br /> Remove promptly upon discovery standing water or liquid in the primary tank , secondary containment area, interstice, or spill container. Before dischargeto the <br /> environment, inspect the liquid for regulated products or other contaminants and disposed of it properly. <br /> to order to comply with EPA SPCC (Spill Prevention, Control and Countermeasure) rules , a facility must regularly test liquid level sensing devices to ensure proper <br /> operation (44 CFR 112.8(c)(8)(v)). <br /> ('} designates an item in a non-conformance status. This indicates that action is required to address a problem . <br /> Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design , a certified inspector, or a tank <br /> manufacturer who will determine the corrective action . Note the non-conformance and corresponding corrective action in the comment section . <br /> r Retain the completed checklists for 36 months. <br /> r' Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists. <br /> Note : If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current <br /> plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation . <br /> AST INSPECTION STANDARD 31 JULY 2006 <br />