Laserfiche WebLink
STI SP001 Annual InfectiChecklist <br /> General Inspection Information : <br /> 1 C11 <br /> Inspection Date: G - r �� Retain Until Date: l o <br /> / {y6 months from <br /> inspection date) <br /> Prinr Incnor4;^n n"t� . / / 7 , /1 <br /> Inspector Name : <br /> Tanks Inspected (10 #'s): /L //i Q � �`� A 7 � Aleo � / 9 E /� / <br /> Inspection Guidance : L- �GrC /`�/�� 1/ls!/' � <br /> i For equipment not included in this standard , follow the manufacturer recommended inspection/testing schedules and procedures . <br /> The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure. This visual inspection does not require a cerfAlled <br /> inspector. It shall be performed by an owner's inspector who is familiar with the site and can identify changes and developing problems, <br /> Inspect the AST shell and associated piping, valves , and pumps including inspection of the coating for Paint Failure. <br /> r Inspect: <br /> 1 , Earthen containment structures including examination for holes, washout, and cracking in addition to liner degradation and tank settling . <br /> 2 , Concrete containment structures and tank foundations/supports including examination for holes , washout, settling, paint failure, in addition to examination for <br /> corrosion and leakage. . <br /> 3. Steel containment structures and tank foundations/suppbrts including examination for washout, settling, cracking , and for paint failure, in addition to <br /> examination for corrosion and leakage , <br /> r Inspection of cathodic protection system, if applicable, includes the wire connections for galvanic systems and visual inspection of the operational components <br /> (power switch, meters, and alarms) of impressed current systems , <br /> Remove promptly upon discovery standing water or liquid in the primary tank , secondary containment area, interstice, or spill container. Before discharge to the <br /> environment, inspect the liquid for regulated products or other contaminants and disposed of it properly, <br /> In order to comply with EPA SPCC (Spill Prevention, Control and Countermeasure) rules , a facility must regularly test liquid level sensing devices to ensure proper <br /> operation (40 CFR 112. 8(c)(8)(v)). <br /> r (*} designates an item in a hon-conformance status. This indicates that action is required to address a problem . <br /> Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design , a certified inspector, or a tank <br /> manufacturer who will determine the corrective action , Note the non-conformance and corresponding corrective action in the comment section . <br /> 'r Retain the completed checklists for 36 months. <br /> r Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists, <br /> r Note : If a change has occurred to the tank system or containment that may affect the SPCC plan, the condition should be evaluated against the current <br /> plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation . <br /> AST INSPECTION STANDARD 31 JULY 2006 <br />