Laserfiche WebLink
State of California Department oPCorrections and Rehabilitation <br /> Memorandum <br /> Date JUL 16 2019 <br /> I,o Robert Burton (A) <br /> Warden <br /> Deuel Vocational Institution <br /> sUbject: DEUEL VOCATIONAL INSTITUTION (DVI) — SPILL PREVENTION, CONTROL, <br /> AND COUNTERMEASURE (SPCC) PLAN <br /> This is a response to your Service Request, dated June 17, 2019, requesting an assessment of <br /> the SPCC Plan. A thorough review was conducted by Tai Nguyen, Civil Engineer, Design <br /> Services. Based on the review and discussion with Svetlana AHL, Associate Hazardous <br /> Materials Specialist, DVI, we feel the SPCC Plan for DVI has been prepared with good <br /> engineering practices and is hereby certified. <br /> If you have any questions, please call Tai Nguyen at (916) 255-3059. <br /> t <br /> RICHARD L. TRA ERSI <br /> Chief, Principal Architect <br /> Design Services Section <br /> Attachment: DVI 19AE2840 Service Request <br /> Spill Prevention, Control, and Countermeasure Plan Certification <br /> cc: Svetlana AHL, Associate Hazardous Materials Specialist, DVI <br /> CDCR-FPCM-FAMB-AE PROJECTS <br /> CDCR-FPCM-DESS-DSS-AE PROJECTS <br /> CDCR-FPCM-CPPSB-AE PROJECTS <br /> CDCR-FPCM-CSB-AE PROJECTS <br /> Mike Beaber, Associate Director(A), DESS <br /> Richard Traversi, Design Services (19AE2840) <br /> Tai Nguyen, Civil Engineer, Design Services <br /> Wendy Lombardi, Plan Room Manager, Design Services <br /> PADESIGN SERVICES\DVI\SR\l9AE2840 SPCC Plan\Documents\DVI 19AE2840 Service Request Response.doc <br /> I <br /> f CDC 16 17(3/89) <br />