Laserfiche WebLink
STATE OF CALIFORNIA DEPARTMENT OF CORRECTIONS AND <br /> REHABILITATION <br /> SERVICE REQUEST <br /> CDCR 995(5/08) PAGE 1 OF 1 <br /> INSTRUCTIONS <br /> This request is to be submitted by institutions when in need of assistance for complex technical issues in which professional Architectural and Engineering <br /> solutions are necessary. Submit the following to the Office of Facilities Planning Construction and Management, Division of Planning,Acquisition and Design,Attn: <br /> Design Services <br /> 1. Submit sketches as necessary. <br /> 2. Identify the problem. Indicate what is to be accomplished. <br /> 3. The solution: Describe, In detail,the recommended change or changes that will be made as applicable. <br /> INSTITUTION DATE <br /> DEUEL VOCATIONAL INSTITUTION (DVI) 6-17-19 <br /> PROJECT <br /> SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN(SPCC) UPDATING WITH 3(THREE)AIR COMPRESSORS <br /> SITE LOCATION <br /> DVI- SITE WIDE <br /> 23500 KASSON ROAD,TRACY,CA 95304 <br /> REFERENCE DATA(Complete as applicable) <br /> SPECIFICATION SECTION NUMBER PAGE NUMBER PARAGRAPH <br /> Table 3; Section 2.2.2 #7,#8 NUMBER N/A <br /> DRAWING NUMBER ENTITLED <br /> N/A Spill Prevention,Control, and Countermeasure Plan for Deuel Vocational Institution <br /> SKETCH NUMBER DATED ENTITLED <br /> N/A N/A N/A <br /> DESCRIPTION(Add extra sheets as necessary) <br /> DETAILED IDENTIFICATION OF THE PROBLEM �T <br /> In order to correct deficiencies as mentioned in the recent San Joaquin County audit on APSA ( violation <br /> # 301) and to comply with 40 CFR 112.5 (a), facility must amend current SPCC, as follows; <br /> 1 . Table 3 must be revised reflecting current quantities and locations of bulk containers ( each equal <br /> 55 gal) with petroleum based oil, oil products and waste oil, stored at the Vehicle Maintenance <br /> Garage, Garage Chemical Storage Area, Used Oil Storage Area, PIA Farm Equipment Storage <br /> Shed and PIA Chemical Storage Area. <br /> 2. To revise Sections 2.2.2; 6.1.2, Table A-1; Table A-3 by addressing the fact that three 2000gallon <br /> diesel tanks at the Boiler House are permanently manifolded tanks as they are designed, installed, and <br /> operating in such manner that they function as a single storage unit manifolded together. <br /> DETAILED SOLUTION PROPOSED OR ACCOMPLISHED <br /> To review the attached revised SPCC, discuss changes and technical amendments , and re-certify it by <br /> PE. <br /> IS THE PROBLEM AN ISOLATED CASE OR CENTRAL? <br /> ❑ ISOLATED CASE ® CENTRAL <br /> SUBMIT SKETCHES AS NECESSARY AND LIST OTHER ATTACHMENTS <br /> Revised SPCC is to be e-mailed to Tai Nguyen, Civil Engineer, Design and Environmental <br /> Services & Standards Branch, Department of Corrections & Rehabilitation <br /> SUBMITTED BY: TITLE DATE <br /> Svetlana AHL AHMS 6-17-2019 <br /> FACILITY TELEPHONE NUMBER <br /> DEUEL VOCATIONAL INSTITUTION 209-835-4141 EX.5092 <br />