Laserfiche WebLink
Section 2 . 4 of revised Play <br /> Violations # 716 & 717 referring to high level monitoring and liquid level sensing devices are in <br /> process of being corrected by purchasing replacement or new sensing devices . All tanks monitoring <br /> systems have been checked and inoperable devises will be purchased and installed within 60 days . <br /> Violation #727 referring to buried piping intregity testing — The records of intregity testing at time of <br /> install are not available at this time . DVI is actively searching for these documents however the <br /> underground piping inspections will be performed as required . Where underground piping exists , a <br /> contract to have the lines tested will be developed and procured . The contract process may take as <br /> long as 120 days . Alternate proposals will be to replace underground piping with above ground <br /> piping where possible . <br /> # 728 — CFR 112 . 8 ( d ) (5 ) — failed to adequately warn vehicle entering facility to protest piping <br /> and other transfer operations . <br /> In respond to this violation be advices that all existing tanks have proper warning signage for tank <br /> content and hazard and also NFPA 704 sign , including tanks in question : <br /> Fresh water booster station — 400 gal tank has proper signage . Tank is located approximately <br /> 50 feet from the road with vehicles access limited by existing water valves and bollards . Photo is <br /> attached . <br /> PIA Farm garage - 2000 gal tank has proper signage and traffic bollards on all sides of tank . <br /> Photo is attached . <br /> PIA Dairy Production — 400 gal belly tank is located on the grassy lawn with no vehicle access . <br /> Vehicle protection is provided by generator package and has proper signage . <br /> However in order to meet requirements installation of traffic bollards will be discussed with <br /> PE at the time of certification of revised Plan . <br /> Waste Water Treatment Plant — 150 gal belly tank is located approximately 10 feet from the curb <br /> and has proper signage . Vehicle protection is provided by generator package . <br /> However in order to meet requirements installation of traffic bollards will be discussed with <br /> PE at the time of certification of revised Plan . <br /> In Summary , DVI has taken corrective action on the violations listed above , however there are <br /> outstanding issues that are dependent on the procurement and ordering process . DVI recognizes <br /> that there is a need to be fully compliant with regulations and requests the opportunity to perform <br /> the necessary corrections within the timeframes identified . Your assistance and patience will be <br /> greatly appreciated . If the proposed corrections are not acceptable , DVI will diligently work to meet <br /> the deadlines provided by your office . <br /> JUL 2 2 21116 <br /> qz <br /> Svetlana AHL <br /> Associate Hazardous Material Specialist <br /> Deuel Vocational Institution <br /> California Department of Corrections and Rehabilitation <br />