My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23500
>
2800 - Aboveground Petroleum Storage Program
>
PR0528391
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 2:56:55 PM
Creation date
7/10/2019 9:50:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0528391
PE
2832
FACILITY_ID
FA0007158
FACILITY_NAME
CDCR-DEUEL VOCATIONAL INSTITUTION
STREET_NUMBER
23500
STREET_NAME
KASSON
STREET_TYPE
Rd
City
Tracy
Zip
95304
APN
23912001
CURRENT_STATUS
01
SITE_LOCATION
23500 Kasson Rd
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State of California Department of Corrections & Rehabilitation <br /> Memorandum <br /> Date July 31 2019 <br /> To San Joaquin County <br /> Environmental Health Department <br /> Attn . : Lydia Baker, REHS <br /> RECEIVED <br /> From : CDCR - Deuel Vocational Institution <br /> JUL 0 2019 <br /> LM 1RONNIENTAL t-WALTH <br /> SUBJECT : Return to Compliance Statement Ul'- I'Altl '� ILN' 'f <br /> This Statement is to respond to Aboveground Storage Act Inspection Report at Deuel Vocational <br /> Institution on several deficiencies that have been noted during facility inspection on June 12 , 20191 <br /> as specified below: <br /> #301 CFR 112 . 5 (a) — Failed to amend Plan as necessary. <br /> Plan has been revised to reflect current number of 55 gal bulk containers with petroleum based <br /> products and waste oil at the Vehicle Maintenance Garage , and Waste Oil Storage Area . <br /> Plan has been revised to address three 2000 gallon diesel tanks at the Boiler House , that have <br /> been installed and operated as a single storage unit, are manifolded together, so are <br /> permanently manifolded tanks , which adequately changes potential release scenario . <br /> Service Request form to obtain Professional Engineer ( PE ) certification of the Plan has been <br /> submitted to Richard Traversi , Principal Architect, Chief of Design Services , at the Design & <br /> Environmental Services & Standards Branch , Department of Corrections & Rehabilitation on <br /> 6/17/ 19 . Copy of Service Request is attached . <br /> # 711 CFR 112 . 8 (c) ( 6) — failed to perform scheduled tank tests or inspections by <br /> appropriately qualified personal . <br /> Annual tanks inspections for 2019 have been conducted on June 12 , 2019 . Inspection records <br /> as proof of practice are attached for each tank . <br /> 3000 gallon diesel and 2000 gallon gasoline tank at the Garage fueling station is now, starting <br /> June 2019 , being inspected on a monthly basis with utilizing Monthly Inspection Assessment <br /> Form (Attachment H ) as specified by Plan . Inspection records as proof of practice are <br /> attached . <br /> # 714 — CFR 112 . 8 (c) (8) ( i -iv) — failure to provide the 2000 gallon diesel tank located at the PIA <br /> Farm Equipment Maintenance Shop with a high liquid level alarm with audible or visual <br /> signal . . <br /> This deficiency has been corrected on June 18 , 2019 by installation of liquid level gauge . Photo <br /> of the 2000 gallon diesel tank with installed gauge at the PIA Farm Equipment Maintenance <br /> Shop is attached . <br /> Svetlana AHL <br /> Associate Hazardous Material Specialist <br /> Deuel Vocational Institution <br /> ° CDC 1617 (3/89) <br />
The URL can be used to link to this page
Your browser does not support the video tag.