Laserfiche WebLink
al .1 <br /> GROUNDWATER SAMPLING FORM <br /> AjhL PROJECT INFORMATION <br /> qW PROJECT NAME y— PROJECT NUMBER [L[ - C1C>C'k WELL NO <br /> PROJECT MANAGER TYPE OF WELL Monitonng Extraction Other <br /> RECORDED BY -A SAMPLED BY -off DATE <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> Well Casing Diameter <br /> 24nch flinch Other <br /> Bader - Type <br /> Well Total Depth T?,R feet below Top of Casing,TD - Pump - Type y'�- Y�A <br /> Other - Specify <br /> Depth to Water S feet below Top of Casing,WL Hydrocarbon Yes Odors <br /> o <br /> Water Column Length -l�J feet <br /> Purge Volume Calculation (Water Column Length x2Multiplier x No Volumes = Calculated Purge Volume) <br /> \'6 X13 X X eo -7 Calculated Purge Volume = allons <br /> (WCL) (Multiplier) (No Volumes) Actual Purge Volume = _gallons <br /> Multiplier (CasinqDfameter Inches = Gallonsllinear foot 2=017 4=066 6=15 8=26 <br /> Groundwater Parameter Measurement- Meter Type ��Calibrated Yes_No <br /> TIME ELAPSED FLOWRATE DTW pH ECTURBIDY REDOX COMMENTS <br /> TIME (GP" (ft) anhor cm eg C IT <br /> (N ) mV <br /> d <br /> /043 O C,0,5 1% Z`z. <br /> X02% f6 %900 Z-[, 3 <br /> vAQ <br /> L L•5� r <br /> ZlZ <br /> [Z - <br /> • <br /> sh"R <br />