Laserfiche WebLink
' Project KING ISLAND HOLIDAY HARBOR Log of Boring/monitoring Well <br /> Boring Location AT KING ISLAND Project No 50133-001-02 SB-27 <br /> Subcontractor and Equipment HAND AUGER Logged By C <br /> Sampling Method CONTINUOUS SPLIT SPOON monitoring Device PID Comments <br /> Start Date/Time 2/13/96//1300 Finish Date/Time 2/13/96/ 1200 COLLECTED GROUNDWATER AT <br /> l 1330 <br /> First Water (bgs) GROUND SURFACE Stabilized Water Level (bgs) NA <br /> 1 � o Surface Elevation NA Casing Top Elevation NA <br /> Z o E �, Boring Abandonment/ <br /> fn <br /> a J'CL DESCRIPTION <br /> 1 E o o a u c"'� (color, grain size, consistency, moisture, other) Well Construction Details <br /> o m a a CC n <br /> S131-27-0 og o a ` BLACK (10YR 2/1) SANDY SILT (ML) with trace clay, <br /> 1 � 1 wet, 1-112S odor 0,65,30,5 VGrou <br /> t <br /> 0 2 + BLACK (10YR 2/1) CLAYEY ORGANIC SILT (OL) wet to <br /> moist, high plasticity, low density (0,0,80,20) <br /> 1 3 <br /> 4- <br /> 5- <br /> 7- <br /> 10- <br /> 11 57,o11 <br /> 12 <br /> 13 <br />' 14 <br /> 15 <br /> 16 <br /> 17 <br /> 18 <br /> 19 <br /> 20- <br /> 21 <br /> 22 <br />' 23 <br /> 24 <br /> 25 <br /> U <br /> 26 <br /> 27 <br /> x <br /> 2' <br /> 0 <br /> 29 <br /> aI 130L <br /> Q Reviewed By Date <br /> SECOR Revised By Date Page-Lof-i- <br />