My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
11530
>
2900 - Site Mitigation Program
>
PR0541077
>
ARCHIVED REPORTS XR0007020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 12:07:42 PM
Creation date
7/10/2019 10:09:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007020
RECORD_ID
PR0541077
PE
2960
FACILITY_ID
FA0023517
FACILITY_NAME
PS MARINA 5 / KING ISLAND RESORT
STREET_NUMBER
11530
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
07119006
CURRENT_STATUS
01
SITE_LOCATION
11530 W EIGHT MILE RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Ist Quarter 1993 Groundwater Monitoring Report <br /> King Island Resort, Stodkton,CA (Site Code 1557) <br /> Project No W0367 00 <br /> Page 2 <br /> TPHG TPHD was detected only in well MW4 The approximate extent of dissolved <br /> contaminants (benzene) is shown on Figure 3 Analytical results are summarized in Table 2 <br /> Laboratory reports with chain-of-custody documents are included in Attachment 2 <br /> Groundwater beneath the site will continue to be monitored on a quarterly basis The next round <br /> of monitoring and laboratory analyses is scheduled for June 1993 <br /> In addition to groundwater monitoring, the property owner is currently evaluating potential <br /> remedial action alternatives Remediation options under consideration for the site are 1) <br /> groundwater extraction and on site treatment, 2) in-situ enhanced bioremediation, 3) passive <br /> remediation with continued groundwater monitoring Options 1 and 2 may not be suitable for <br /> the site due to the relatively low permeability and apparent low transmissivity of site soils <br /> Option 3 may be the most feasible remediation alternative based on site limitations However, <br /> additional monitoring wells may be necessary to monitor the effectiveness of natural degradation <br /> of contaminants <br /> If you have any questions or comments regarding this project, please contact John Lane at (209) <br /> 838-3507 <br /> Respectfully, <br /> RESNA Industries, Inc <br /> /L� RED OEOC <br /> John P Lane <br /> Project Geologist �`" <br /> GREGORYP. <br /> STAHL <br /> No 5023 <br /> Gregory P Stahl <br /> CA Registered Geologist No 5023 `r�'9T <br /> £ of <br /> JPL/ggk <br /> Attachments <br /> PC CRWQCB <br /> Yvonne Mabee <br /> Donald McShane <br />• <br /> 1QR-1993 FNL <br />
The URL can be used to link to this page
Your browser does not support the video tag.