Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> PROJECT INFORMATION <br /> PROJECT NAME ir1eS I k)7- PROJECT NUMBER Sq.6- 61 •0001 WELL NO nnv.�3 <br /> PROJECT MANAGER --S TYPE OF WELL ✓Monitoring Extraction Other <br /> RECORDED BY SAMPLED BY DATE O ( (zf d - <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> Weti asmg Diameter <br /> Z-+nch 4-inch Cther ✓Bailer - TypePump - Type 14(6 <br /> Well Total Depth �$-9 feet below Tap of Casing,TD Other - Spec:ty <br /> Depth to Water 7JS feet below Top of Casing,WL <br /> Hydrocarbon Odor_*r <br /> Water Column Length feet Yes Y' No <br /> Purge Volume Calculation (Water Column Length x Multiplier x No Volumes = Calculated Purge Volume) (� <br /> X 7 X `� — T� 41 <br /> Calculated Purge Volume = ! alions <br /> (WCL) (Multiplier) (No Volumes) Actual Purge Volume gallons <br /> l 111oiier (CasiM Diameter Pncthesi =GaltonsAtnear foot} 2=9-IT 4=101.66 6=1a 8�=2.6 <br /> Groundwater Parameter Measurement Meter T I jl'-C Calibrated ✓ Yes No <br /> TIME ELAPSED FLCWRATE DTW pH EC IT <br /> TURSIDY REDOX COMMENTS <br /> TIME (G?14t) (R) anhaslcm (NTLI) mV R * ' <br /> d F �7 <br /> IL Z N A P1 A <br /> 12 <br /> 00 36 ,2q 0 r <br /> 60q Z 'zo <br /> I <br /> a <br /> I <br /> I <br /> I I <br /> I I <br /> I <br /> %A=Ass<)CjATF.S INC. <br /> SWROMMENTAL,GECTECHN)CAI.AND MATT MALS PI20fE5S10NAL5 <br />