Laserfiche WebLink
ATC Associates SITE SAFETY PLAN <br /> On-site communications 0 Radio IM Verbal 0 Hand Signals <br /> 0 Other <br /> Designate hand signals here: <br /> Off-site communications 0 Radio ® Telephone <br /> 0 Other <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: To be determined on-site-prior to beginning work activities. <br /> MARK EVACUATION ROUTE(S) ON SITE MAP O CHECK WHEN DONE <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: All contaminated personal protective equipment <br /> G e , gloves, coveralls) will be placed in 5-gallon <br /> bucket and stored onsite with drill cuttings <br /> Location of Wash Water. Restroom on-site <br /> Location of Toilet Restroom on-site <br /> Location of Drinking Water. ATC truck <br /> MARK LOCATION OF EYEWASH AND SHOWER DRENCH ON SITE MAP L7 CHECK WHEN <br /> DONE <br /> Equipment Decontamination Procedure Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned <br /> Materials to be Disposed of as Hazardous Waste All soil and water produced during drilling <br /> activities will be stored on-site in a 5-gallon <br /> bucket. <br /> PAGE 11 <br />