My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007054
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
11530
>
2900 - Site Mitigation Program
>
PR0541077
>
ARCHIVED REPORTS XR0007054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 11:57:59 AM
Creation date
7/10/2019 10:17:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007054
RECORD_ID
PR0541077
PE
2960
FACILITY_ID
FA0023517
FACILITY_NAME
PS MARINA 5 / KING ISLAND RESORT
STREET_NUMBER
11530
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
07119006
CURRENT_STATUS
01
SITE_LOCATION
11530 W EIGHT MILE RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> CONTENT PAGE <br /> 1.0 RECORDING OF FIELD DATA..........................................................................................1 <br /> 2.0 SAMPLE CONTAINERS.......................................................................................................2 <br /> 3.0 QUALITY CONTROL FIELD SAMPLES..........................................................................2 <br /> 4.0 SAMPLE PRESERVATION..................................................................................................3 <br /> 5.0 CHAIN-OF-CUSTODY PROCEDURES.............................................................................3 <br /> 51 Sample Labels 3 <br /> 52 Chain-of-Custody Record and Sample Analysis Request Form 3 <br /> 53 Delivery of Samples to Laboratory 4 <br /> 6.0 SAMPLING AND DRILLING EQUIPMENT DECONTAMINATION..........................4 <br /> 7.0 FIELD EQUIPMENT CALIBRATION AND MAINTENANCE......................................5 <br /> 9.0 LABORATORY QA/QC PLAN............................................................................................7 <br /> 9.0 GROUNDWATER MONITORING PROTOCOL.............................................................7 <br /> 10.0 WELL DEVELOPMENT PROTOCOL...............................................................................9 <br /> 11.0 SOIL SAMPLING PROTOCOL.........................................................................................10 <br /> III Sample Collection During Drilling Activities 10 <br /> 112 Sample Collection During Tank Removal 11 <br /> 113 Sampling from Soil Piles or Shallow Soil Pits 12 <br /> 12.0 GROUNDWATER MONITORING PROTOCOL...........................................................12 <br /> TABLES: <br /> 1 - Sample Containers, Holding Times and Preservation <br /> 2 - Laboratory Test Methodology Underground Tank Sites <br /> M 1 lw ladmin\she11slgagc-97 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.