My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007054
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
11530
>
2900 - Site Mitigation Program
>
PR0541077
>
ARCHIVED REPORTS XR0007054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 11:57:59 AM
Creation date
7/10/2019 10:17:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007054
RECORD_ID
PR0541077
PE
2960
FACILITY_ID
FA0023517
FACILITY_NAME
PS MARINA 5 / KING ISLAND RESORT
STREET_NUMBER
11530
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
07119006
CURRENT_STATUS
01
SITE_LOCATION
11530 W EIGHT MILE RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i+ <br /> j <br /> al <br /> Smith Technology Corporation <br /> Quality Assurance/Quality Control Plan <br /> Revised February 1995 <br /> deionized water this procedure will be carred out on-site before sampling of other monitoring wells, if <br /> more than one well is to be sampled with the sample sampling device <br /> Immediately prior to sampling, the depth to water (DTW) in the well will be recorded The thickness <br /> of product on top of the groundwater, if present, will be measured using an interface probe The <br /> procedure for monitoring is presented in Section 9 0 (Groundwater Monitoring Protocol) <br /> If free product is detected, analysis of groundwater at the interface for dissolved product will not be <br /> conducted A product sample will be collected for source identification If all free product cannot be <br /> removed, an interval specific sampling device may be utilized to collect a sample from below the zone <br /> of free product Before collecting groundwater samples from each well, the well will be purged until <br /> indicator parameters (temperature, conductivity, and pH) stabilize This will entail the removal of at <br /> least four well casing volumes by bailing or pumping The criteria for determining well casing volumes <br /> and temporary storage of purged water is outlined in Section 10 0 (Well Development Protocol) The <br /> indicator parameter measurements will be taken both before and after purging of each well casing <br /> volumes Once the well is purged and indicator parameters have stabilized, a sample will be collected <br /> after the water level approaches 80 percent of its initial elevation Where water level recovery is slow, <br /> the sample will be collected after stabilization is achieved and enough water is present to fill sample <br /> containers <br /> Cross contamination from transferring pumps (or bailers) from well to well will be avoided by utilizing <br /> dedicated equipment Where this is not feasible, thorough cleaning of equipment will be performed <br /> between sampling rounds Sampling will proceed from the least contaminated to the most <br /> contaminated well, if information is available before sample collection, or if it is indicated by field <br /> W 1Admm1She11s1QAQC-97 DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.