Laserfiche WebLink
ATC Associates SITE SAFETY PLAN <br /> s <br /> Physical Hazards <br /> Task(s) Hazard Mitigation Measure <br /> 1 Heavy Equipment(Noise & Physical All heavy equipment used on this project will <br /> contact) be in good working order and operated in <br /> accordance with recognized industry standards <br /> and Cal-OSHA Title 8, Subchapter 4, <br /> Construction Safety Orders In addition, an <br /> exclusion zone applies to all personnel The <br /> exclusion zone will be 20 feet to the front and <br /> either side of the operating drill rig Personnel <br /> will not be allowed under booms or augers at <br /> any time <br /> All equipment operators and ground crews <br /> working in close proximity of heavy equipment <br /> will be supplied with ear protection <br /> PAGE 6 <br />