Laserfiche WebLink
DEL-TECH Geotechnical Support Services <br /> MONITORING WELL SUMMARY LOG <br /> ( FEET. HUNDREDTHS) <br /> DEPTH TO WATER --� <br /> SITE: KING ISLAND TRAILER PARK <br /> WELL ELEV. <br /> MSL <br /> DATE MW-1 MW-2 MW-3 MW4 MW-5 MW-6 MW-7 <br /> 03/21/96 7.12' <br /> DEPTH OF 77.55' <br /> WELL <br /> INSTRUMENTATION: ORION pH/TEMPERATURE METER 2 POINT pH CALIBRATION (4.0&7.0) <br /> ORION CONDUCTIVITY METER <br /> YSI 3560 FLOW-THROUGH CHAMBER <br /> YSI DISSOLVED OXYGEN METER <br /> ENVIRONMENTAL INSTRUMENTS SLOPE METER <br /> KECK PRODUCT INTERFACE METER <br /> THERMODYNE 580B PHOTO IONIZATION DETECTOR <br /> 1. ALL MEASUREMENTS ARE MADE FROM THE NORTH SIDE AND TOP EDGE OF THE WELL CASING, <br /> NOTCH IN THE TOP OF CASING OR BLACK MARKING,WHICH EVER ONE IS APPROPRIATE. <br />