My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
11540
>
2900 - Site Mitigation Program
>
PR0506051
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 12:26:05 PM
Creation date
7/10/2019 10:29:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0506051
PE
2950
FACILITY_ID
FA0007171
FACILITY_NAME
HOLIDAY HARBOR/INTREPID MARINE
STREET_NUMBER
11540
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
07119004
CURRENT_STATUS
02
SITE_LOCATION
11540 W EIGHT MILE RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
it <br /> i� <br /> Mr. Michael Infurna ` <br /> December 19, 1995 <br /> Page 4 it <br /> ii j <br /> In addition to 8015/8020 and 5520 analyses, samples collected from the former spray painting area within the <br /> boat storage yard will also be analyzed for semi-volatile organics!using EPA Method 8270 and CAM 17 <br /> metals. 'r ' <br /> Task 4: Report Preparation <br /> Following completion of the above activities, SECOR will prepare a detailed report documenting our i <br /> procedural steps, analytical results, and recommendations, as appropriate. A scaled diagram of the subject <br /> property depicting boring locations will also be provided. Appendices will include boring logs as well as <br /> laboratory reports. A copy of the report will be forwarded to the County upon completion. <br /> IF <br /> SCHEDULE E f <br /> SECOR would like to begin work on this project as soon as possible.: We have tentatively scheduled drilling <br /> for the beginning of January. Please let us know if this timetable is obtainable. Soil and groundwater sampling <br /> can be completed within one week. Please do not hesitate to contact us with any questions at (415) 882-1548. <br /> I <br /> Sincerely, <br /> SECOR International Incorporated <br /> Terri PI tt- Imey lynn ardiman <br /> Project G 1 ist Principal Geologist <br /> t k <br /> Andrew Wright, R.G. <br /> Principal Geologist ;t <br /> G <br /> i3 <br /> !t <br /> E <br /> :i <br /> ie <br /> r <br /> .i <br /> �k <br /> h:SwerMecSsrknii.wp <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.