Laserfiche WebLink
' Project: KING ISLAND/1-101-10h, iARBOR Log of Borin <br /> g/Monitoring"•Well:'=' <br /> Boring Location: AT KING ISLAND Project No.: 50133-001-0 <br /> Subcontractor and Equipment: V dt W AND AUGER Logged By. C.M, SB-14 <br /> Sampling Method: HAND AUGER Monitoring Device: OVM 5808 Comments: <br /> Start Date/Time: 1 25 96 1430 Finish Date/Time: 1/25/96L1445 <br /> First water (bgs): GROUND SURFACE Stabilized Water Level (bgs): NA <br /> a Surface Elevation: NA Casing Top Devotion: NA <br /> aCL J Boring Abandonment/ <br /> o N V <br /> 'UTHOLOGIC DESCRIPTION <br /> 0 0 o 0 in o (calor, grain size, consistency, moisture, other) Well Construction Details <br /> in a o of <br /> a <br /> OW j i REDDISH BLACK (I OR 25/1) CLAYEY ORGANIC SILT <br /> Zo <br /> SEI-14—l' z= 1 l (OL) wet, spongy, high plasticity, H2S odor (0,0,70,30) Grout <br /> 2 DARK GRAY (10YR 4/1) GRAVEL (GP) rounded to <br /> subrounded coarse gravels of leach field, wet (100,0,0,0) <br /> ' <br /> 3- <br /> 4- <br /> 5 <br /> 6 - <br /> 7- <br /> 12- <br /> 13- <br /> 14- <br /> 16- <br /> 17- <br /> 18- <br /> 19- <br /> 20- <br /> 21- <br /> 22 7]z13i4 161718]9202122 <br /> 23 <br /> 24 <br /> 25 <br /> 26 <br /> 27 <br /> i <br /> zB <br /> r <br /> 29 <br /> lV <br /> 30 <br /> 'p Reviewed By. Date: <br /> SECOR Revised By. Date: Page-1—of—L <br />