Laserfiche WebLink
Project: KING ISLAND HOLT 'i HARBOR -« — it f Log of Boring/trlanitonngWelk <br /> Boring Location: AT KING ISLAND Project No.: 50133-001-- SB-25 i <br /> Subcontractor and Equipment: HAND AUGER Logged By. C.M.: <br /> Sampling Method: CONTINUOUS SPLIT SPOON Monitoring Device: PID i Comments: <br /> Start Date/Time: 2L13/96//110O Finish Date/flme: 2/13/96//1200 COLLECTED GROUNDWATER AT <br /> 1400 <br /> First Water (bgs): X5.0 FEET Stabilized Water Level (bgs): NA <br /> Surface Elevation: NA Casing To Elevation: NA <br /> Z a u J Boring Abandonment/ <br /> ;, IJTHOLOGIC DESCRIPTION Well Construction Details <br /> o # a. Ln <br /> a (color, grain size, consistency, moisture, other) <br /> E o a d m Lno <br /> co a o o! a <br /> UI <br /> DARK GRAYISH BROWN (10YR 4/2) SANDY CLAY CL <br /> 0 1 with silt. sand is very fine to fine, moist, roots, patches <br /> of different soil type indicate fill,!jmoderate plasticity <br /> 2 0,20,10,70) i <br /> 0 3 VERY DARK GRAY (10YR 3/1) SANDY SILT (ML) with Grout <br /> trace clay, sand is very fine, moist <br /> sa-25-40 4 0 -4.5 feet old concrete slab overlying sand backfill <br /> Z <br /> 5 VERY DARK GRAYISH BROWN (2.5Y 3/2) SANDY SILT <br /> a 6 ML with clay <br /> a <br /> aGREENISH GRAY 3GY 5/1) SAND '' SP with silt <br /> 7 Bentonite <br /> 8 + Y Pellets'- <br /> --9 a <br /> .d <br /> 10 �! <br /> 11 �� <br /> 13- <br /> 14- <br /> 15 <br /> 314 15 <br /> 16- <br /> 17 <br /> 6 17 E� <br /> is- <br /> 19- <br /> 20- <br /> 21- <br /> 22- <br /> 23- <br /> 24- <br /> 25- <br /> 26- <br /> 27- <br /> 28- <br /> 29 <br /> B19 20 2i222324252B 2728 29 <br /> 0 <br /> 30 <br /> Reviewed B)r Date: <br /> SECOR. Revised By. Date: Page-1—of—L <br /> f <br /> ii <br />