My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STAGECOACH
>
2714
>
2800 - Aboveground Petroleum Storage Program
>
PR0528419
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 1:05:56 PM
Creation date
7/10/2019 10:46:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0528419
PE
2832
FACILITY_ID
FA0014705
FACILITY_NAME
711 MATERIALS
STREET_NUMBER
2714
STREET_NAME
STAGECOACH
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
17334014
CURRENT_STATUS
01
SITE_LOCATION
2714 STAGECOACH RD
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{ LL �- <br /> 1111 Ll <br /> Figure 1. Truck Wash Area (Tank Removed) <br /> Item # 622: <br /> CFR 112.7(0(3) Failure to conduct complete annual discharge prevention briefings for oil- <br /> handling personnel. <br /> The last discharge prevention briefing was on May 7, 2018. Discharge prevention briefings <br /> are not scheduled at least once a year. Discharge prevention briefings for oil handling <br /> personnel must be scheduled and conducted at least once a year to assure adequate <br /> understanding of the SPCC Plan for that facility. Such briefings must highlight and describe <br /> known discharges or failures, malfunctioning components, and any recently developed <br /> precautionary measures. Immediately schedule and conduct a discharge prevention briefing, <br /> ensure that they are scheduled and conducted at least once a year and submit proof to the <br /> EHD. <br /> This is a minor violation. <br /> 711 Materials Response: <br /> The facility completed an annual discharge prevention briefing on June 11, 2019. The sign-in <br /> sheet for the training is included in Attachment 1. The discharge prevention briefing included <br /> discussion of past discharges or failures, leak inspection and notification procedures, spill <br /> response and notification procedures, as well as proper AST operation at the facility. 711 <br /> Materials will be sure to conduct these briefings annually going forward and document the <br /> trainings in the SPCC Plan. <br /> Item # 711: <br /> CFR 112.8(c)(6) Failed to perform scheduled tank tests or inspections by appropriately <br /> qualified personnel. <br /> The SPCC plan calls for quarterly inspections on page 19. Quarterly inspections are not being <br /> done. Each aboveground container shall be tested and inspected for integrity on a regular <br /> schedule and whenever repairs are made. The qualifications of personnel performing tests <br /> and inspections, frequency and type of testing and inspections that take into account container <br /> July 3, 2019 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.